Andrian
Living Andrius

Quiet yet central location in Andrian
Last 1- and 4-bedroom apartments available; apartments not subject to price controls
Construction has already started, completion in autumn 2026

Living comfort at the highest level


ZIMA is realizing an exclusive residential complex with 20 residential units in the idyllic heart of Andrian. Surrounded by picturesque vineyards and blooming apple orchards, this location offers a quiet yet centrally located oasis. The climate house of category "A" convinces with an extremely low energy balance and high-quality equipment that meets the highest demands. All units are individually customizable and have cellar compartments and garages in various sizes. The interior design – from tiles and wooden floors to doors and bathroom furnishings – is completely designed according to the personal wishes of the future residents.

Choose your
dream apartment

Here you can view all apartments at a glance or filter them according to your preferences. Click on a specific unit to view details and floor plans. By the way: You can save your apartment selections at any time for later and access them in your watchlist.

House
A B
floors
ground 1st 2nd 3rd
Number of rooms
1 2 3 4
Living space
20 m² 120 m²
Price
210000 910000
Agenda Item (2) House Room floor Living space Price Bookmark
B11 House: B 4 3rd 94 m² 804000
B03 House: B 1 ground 28.05 m² 210000

Unfortunately, there are no apartments available

Object Name
House | Floor | Top
Project Name
Living space
  • Element
Purchase price of the apartment
plus utilities
Monthly rate starting at
Investor: Purchase price of the apartment
plus sales tax and additional charges
Purchase price for TG parking space
plus utilities
Investor: Purchase price for TG parking space
plus sales tax and additional charges
Operating costs

Pure quality of life
in a central location


Located halfway between the charming cities of Bolzano and Merano and near Terlan, where the middle and music school, a pharmacy, a butcher shop, sports and ice rinks, and tennis courts are located, Andrian is perfectly positioned. The location of the residential complex is ideal for nature lovers and offers excellent access to the cycle path network. This allows residents to explore the breathtaking landscape and at the same time benefit from the proximity to amenities. In Andrian itself there is a kindergarten and a primary school, a grocery store and an outdoor swimming pool, all of which contribute to making life in this charming village pleasant. In addition, Andrian is home to South Tyrol's oldest winery cooperative, giving residents the opportunity to experience the region's rich wine tradition up close.

To view the map on Google Maps, you must allow the script to load.
  • Good local amenities, a few minutes' drive to Terlan with further shopping opportunities
  • Very good transport connections to Bolzano – approx. 20 minutes by car to the city center
  • Very natural location with numerous local recreation opportunities

CONSTRUCTION PROGRESS

We’d love to keep you updated! Just enter your email address, and we’ll send you regular construction updates.

May 2026

The hardwood floors in the apartments of Building A have been installed, the interior doors have been fitted, and the installation of the plumbing fixtures is nearing completion. In Building B, the windows have been installed, and the hardwood floors are currently being laid. In calendar week 22, the interior doors will be installed, and work will begin on installing the plumbing fixtures. In the basement … Read more
April 2026

Building A: The exterior scaffolding has been removed, the balcony railings have been installed, and the window units have been put in place. Tiling work inside the apartments is complete, and the hardwood floors are currently being installed. The electrician’s finishing work is also well underway. The delivery and installation of the plumbing fixtures will take place shortly… Read more
March 2026

Work on the facades of Building A has been completed. The scaffolding is being dismantled in stages as the balcony railings are currently being installed. Tile installation in the apartments is proceeding as planned. Delivery and installation of the windows is scheduled for the end of March. At the same time, electrical work is being carried out … Read more
February 2026

House A:
The roofing work, including plumbing and roof covering, has been completed. The final coat of paint will be applied to the facades shortly. Inside the building, the rough plaster has been completed on all floors. The fine plaster has already been applied on the ground floor and first floor, which means that work can begin soon on ... Read more
December 2025

In Building A, the reinforcement coating on the ETICS has been completed. The final coating will be applied in early 2026. The rough installations have been completed and all screeds have been laid in the building. Interior plastering work is currently underway. Roofing with tiles has begun on Building B. The ETICS has been installed ... Read more
November 2025

House A: Roofing completed, ETICS completed, currently reinforcement filling, rough installations completed on ground first floor, underfloor heating laid, screed laid, interior plastering to follow, top on the second floor and top to be completed shortly
House B: Roof truss assembled, roof package in progress, apartment partition walls completed
October 2025

House A: The carpentry work on the roof has been completed. Plumbing work is currently being carried out, after which the roof covering can be applied. Inside the building, the rough installations are underway. Work has started on the ETICS on the façade.
House B: The shuttering of the final reinforced concrete ceiling will begin shortly.
September 2025

The structural work on House A is nearing completion. The carpenter is currently erecting the roof truss, and the shell installation has already begun in the apartments. The reinforced concrete elements of the 1st floor of House B have been completed. The brickwork for the exterior walls will begin shortly, followed by the formwork for the ceiling above the first floor.
June 2025

The reinforced concrete ceiling above the first basement floor has been completed. Currently, the reinforced concrete supports and wall panels are being constructed on the ground floor, as well as the erection of the exterior walls using brick construction. The formwork for the reinforced concrete ceiling above the ground floor of House A will begin shortly.
May 2025

The start of the construction work has taken place and the ceiling above the 2nd UG has already been realized. Currently, the reinforced concrete elements in the 1st UG are being carried out and the formwork of the ceiling above the 1st UG will take place shortly.
February 2025

The excavation and work on securing the excavation pit could be continued as planned after Christmas. The construction site equipment is nearing completion and the construction company will soon begin with the foundations.
December 2024

The micropile wall has been erected, the excavation and the realization of the nail wall have begun.
October 2024

The demolition work on the existing buildings has begun and the excavation pit securing and excavation will be tackled subsequently.