Heiden
Sägewies III

Sunny & quiet location in the Appenzell Vorderland
Only a few 3.5 to 5.5-room condominiums still available
Already under construction, ready for occupancy in early 2027 – get involved in the planning now!

In sunny and fog-free Heiden, the new „Sägewies III“ hillside development with 15 stylish apartments in three modern residential buildings is being built on the southern edge of the village. So close to nature and yet with good connections and infrastructure, life is very relaxed.

On the regular floors, south-facing 3.5 and 4.5-room apartments with optimal floor plan organization are being built. The spacious seating areas and terraces directly in front of the living rooms each have a practical outdoor storage room. A highlight are the three 5.5-room attic apartments, each of which also has direct elevator access and large, covered terraces.

At the northern foot of the slope, a network of pedestrian paths leads to the main entrances of the three building units. Ample parking spaces are available in the spacious underground garage. The underground garage entrance is located directly on the north-western property boundary and is therefore away from the apartments and causes no disturbance.

CHOOSE YOUR
DREAM APARTMENT

Here you can find all apartments at a glance or filtered according to your preferences. You can get details and floor plans by clicking on the respective element. By the way: You can save your apartment selection at any time for later and call it up in your watch list.

House
A B C
Floors
Ground 1st 2nd
Number of rooms
3.5 4.5 5.5
Living space
100 m² 210 m²
Price
730000 1370000
TOP (4) House Room floor Living space Price Save
B 0.2 House: B 3.5 Ground 101.9 m² 790000
A 2.1 House: A 5.5 2nd 202.4 m² 1370000
A 1.2 House: A 3.5 1st 101.9 m² 730000
A 0.2 House: A 3.5 Ground 101.9 m² 790000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
Living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

A property on
the sunny side


Infrastructure within walking distance and good transport connections:

  • 3 minutes by car to Heiden train station
  • 5 minutes walk to the Migros supermarket
  • 10 minutes walk to the center of Heiden
  • Shopping facilities, restaurants, cafes, etc. in the town center
  • 5 minutes walk to the nearest bus stop (Trogen, Heerbrugg, Reute)
  • 20 minutes by car to St. Gallen

Recreation within easy reach:

  • A few minutes' walk to the Chindlisteinweg entrance – circular hiking trail
  • 5 minutes' walk to the Heiden ski lift
  • 10 minutes' walk to the Heiden outdoor swimming pool
  • 15 minutes by car to Lake Constance
To display the Google Maps map, loading the script must be allowed.
  • 5 minutes on foot to Migros, 3 minutes by car to Coop
  • 5 minutes on foot to the Bissau bus stop, 3 minutes by car to the Heiden train station
  • 20 minutes by car to St. Gallen
  • Kindergarten, primary/secondary schools, health academy in the vicinity

Construction progress

We would be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

November 2025

Die Bauarbeiten an den drei Mehrfamilienhäusern an der Sägewiesstrasse in Heiden schreiten planmässig und erfreulich zügig voran. Beim Haus A steht nur noch die letzte Decke bevor ehe im Januar der Dachstock aufgerichtet werden kann. Mehr lesen
October 2025

The ceiling above the first floor of house A has been successfully concreted. In House B, the ceiling of the 1st basement floor has been completed. The walls of the 1st basement floor of House C have been completed. The next stages of the construction process now include the backfilling work and preparations for the next concreting stages.
July 2025

The cranes have been erected and the first walls of the UG have already been concreted.
May 2025

Our drone shows: The construction work is progressing rapidly – everything is going according to plan. The foundation stone for modern living in a green environment has been laid.
May 2025

The work on the Sägewies III hillside development on the southern edge of Heiden is progressing according to plan. Slope stabilization work and excavation of the building site are currently taking place. As soon as the excavation reaches the underground parking level, the first construction crane will be erected. The first concrete work is scheduled for June.
March 2025

In Heiden, construction work on the new Sägewies III project is progressing according to plan. The site is being excavated piece by piece and the building site is being prepared.
December 2024

The ceremonial ground-breaking ceremony and thus the start of construction for the new Sägewies III project in Heiden took place this week before Christmas. In the presence of project participants, representatives of the municipality of Heiden, buyers and the ZIMA Projektentwicklung AG team, the starting signal was given for the three-part building ensemble. Let's get started!
September 2024

The building plot in Heiden shows its most beautiful side – the new “Sägewies III” project will create high-quality condominiums in a wonderful hillside location. Construction can start soon!